Case Presentation
Tesla Shanghai Super Plant
Project Introduction
The annual output of Phase I is 250000 pure electric vehicles, and MODEL3 model will be offline in October 2019. The factory adopts a large number of domestic and foreign top manufacturing technologies to realize the digitalization of process, production, equipment and quality control, and achieve the industry-leading automation level and intelligent level.
MACS modular power supply breaks the foreign technical monopoly and is a domestic landmark project for foreign enterprises to adopt modular power supply.
Cathodic electrophoresis equipment for continuous pre-treatment and MACS module power supply conveyed by swing bar, automatic internal and external painting robot and bottom PVC robot, U-shaped drying furnace+RTO waste treatment equipment, intelligent production and management system.
Electrophoresis tank of 22m, 160 tubular anodes in total; The side 75 pair side anodes, 1 dragging 2; Bottom anodes, 1 by 1.
Project Location
 Lingang Industrial Zone, Lianggang West Avenue, Pudong New Area, Shanghai
Production time: October 2019
Project Highlights
10KV dual power supply uninterruptible MACS power supply is so far the most safe rectifier system in China.
Tesla Project in USA
Project Introduction
Following the Shanghai Super Plant, Tesla has built a third factory in the US, producing a wide range of models including Model S, Model X, Model 3 and Model Y. The Tesla Texas facility covers an area of four to five million square feet (3716000 square meters to 4645000 square meters) and is expected to begin operation in Q4 21.
Distributed MOS modular anode control system is adopted, including vehicle identification system interface. Select 50A one-to-one corresponding side anodes (52 side anodes+8 bottom anodes). At 100% load, the power factor is better than 0.98.
Project Location
 United States of America
Production time: December 2021
Project Highlights
Select 50A one-to-one corresponding side anodes (52 side anodes+8 bottom anodes). At 100% load, the power factor is better than 0.98.
Shunyi Plant of BBAC
Project Introduction
The total floor area is 1.06 million square meters, the total investment is 11.9 billion yuan, the annual capacity of the project is 150000 units, and the estimated annual output value is 50 billion yuan. Delivery process by Duer Tilter on site; A total of 50 plate anodes are used in the electrophoresis tank; Module adopts 70A module 1 dragging 1 connection mode; ECOSCREEN software upgrade, body coating monitoring.
Project Location
 Jinchang Road, Shunyi District, Beijing
Production time: June 2020
Project Highlights
Combination of domestic equipment and ECOSCREEN software, quality and power monitoring and data analysis of body coating.
Changsha BYD Plant
Project Introduction
Changsha BYD is the first project of BYD Group in the central region. Its products cover passenger vehicles, commercial vehicles and some core supporting parts. It is one of the strategic bases for new energy vehicle production with the most complete product line at present. On March 20, the first vehicle of Changsha Phase II Plant rolled off the production line, with a planned capacity of 20000 units/month.
Project Location
 Yuhua District, Changsha
Project put into production: April 2022
Project Highlights
It is one of the strategic bases for new energy automobile production with the most complete product line of BYD
Xi'an BYD Plant
Project Introduction
Xi'an plant is the most important production base of BYD in the north. As early as 2014, BYD's factory in Xi'an was put into production, with an annual output of 300000 units. In 2018, the second phase project of new energy vehicles with an annual output of 300000 was launched, achieving the goal of 600000 new energy vehicles. BYD has acquired 2890 mu land in Xi'an, and the annual capacity will reach 900000 units planned after the completion of Phase III construction. Xi'an is not only a factory, but also an important industrial chain base of BYD in the north.
Project Location
 High-tech Zone, Xi'an
Production time: November 2022
Project Highlights
Xi'an is not only a factory, but also an important industrial chain base of BYD in the north.
Hefei BYD Plant
Project Introduction
The models produced by BYD Hefei Base Project are one of the most popular QinPLUS DM-i and destroyer 05 at present. Except for the complete vehicle, core parts such as engine, motor and assembly are all produced in the Hefei Base. Phase I of BYD Hefei Base Project has a total investment of 15 billion yuan and a capacity of 200000 units. After reaching the designed capacity, the annual output value of the Project can exceed 50 billion yuan, and it is expected to drive the total output value of the upstream and downstream industrial chains to 100 billion yuan.
Project Location
 Yuhua District, Changsha
Production time: April 2022
Project Highlights
The annual output value of the project can exceed 50 billion yuan after reaching the designed capacity, and the total output value of the upstream and downstream industrial chains is expected to be 100 billion yuan.
Changzhou BYD Plant
Project Introduction
The automobile industry park built by BYD in Changzhou has an annual output of 400000 new energy vehicles and core parts, and the annual output value will exceed 60 billion yuan after reaching the designed capacity. In the first half of this year, the output of BYD's Changzhou base exceeded 56000 units. In June alone, the output of BYD pure electric vehicle "PLUS" produced by Changzhou base exceeded 15000 sets. The annual output is expected to exceed 200000 units this year. The new model "Seals" will also be mass-produced in Changzhou.
Project Location
 Xinbei District, Changzhou City
Production time: January 2022
Project Highlights
The annual output of 400000 new energy vehicles and core parts will exceed 60 billion yuan after reaching the designed capacity.
Zhengzhou SAIC No.2 Plant
Project Introduction
SAIC Group Motor Co., Ltd. has launched the new 300000 passenger vehicle Zhengzhou production capacity project of SAIC MOTOR. The total investment of Zhengzhou production capacity project is about 4.6 billion yuan and the overall floor area is about 1600 mu, including four process workshops of stamping, body, paint and general assembly, as well as training center, power center, VDC and other operating facilities. It will be a brand new factory with the most complete scale, the most complete supporting facilities and the most advanced technology of SAIC MOTOR in the past decade, and a manufacturing base with high efficiency, lean technology and great potential.
Project Location
 Jiulong Town, Economic Development Zone, Zhengzhou, Henan
Production time: July 2022
Project Highlights
KV dual power supply uninterruptible MACS power supply, successfully adopting power parallel technology and current stabilization mode electrophoresis mode.
Zhejiang Zengbao Painting Electrophoresis Project
Project Introduction
Continuous pass-through cathode electrophoresis process, production program 40JPH; Tilter network provides workpiece model and position information; The power output of 100 modules is 0~500V adjustable, and the output voltage is adjusted in real time according to different positions of the electro-coating vehicle in the slot. MACS system, the first time to identify the domestic self-propelled tilter, position, angle, model number and logistics code tracking production.
Project Location
 Zhejiang Hangzhou Binjiang High-tech Development Zone
Production time: May 2019
Project Highlights
The first MACS module power supply in China, applied in the successful project of tilter and new energy. And successfully applied proprietary ring network gateway.
Changchun Hongqi Factory
Project Introduction
The standard capacity of the workshop is 100000/year, mainly producing four models of Hongqi H9, HS7, E115 and H7. The production line adopts green and environment-friendly water-based 3C2B process, the workshop construction adheres to the concept of "intelligent+green+quality+flexible+lean", adopts digital central control system, E-MES whole workshop visual operation platform, energy management, intelligent electrophoresis voltage control, visual positioning, PCS logistics control system. With advanced coating technology and high-quality materials, the car body will not lose light for 3 years and free from perforation and corrosion for 12 years. We will strive to create a high-quality and high-efficiency first-class coating workshop of Hongqi brand.
Project Location
 Changqing Road, Lvyuan District, Changchun City, Jilin Province
Production time: March 2020
Project Highlights
The domestic MACS power supply system adopts the German EMS software control system for the first time.
1 2 3
前往
Please Fill In The Correct Information And Consult
Electrophoresis coating
Hydrogen production by water electrolysis
Electric flocculation and water treatment
Vacuum coating film
Heating of semiconductor
Electroplating
Electrolytic metal metal
Electrolytic gas
Smelting of rare earth
Ionic membrane caustic soda
Graphite heating
PCB(Printed circuit board)
One-stop solution
One-stop "solution for high-power rectifier
11
12221